Skip to content
← Manufacturing Manufacturing

Kawader ERP — Furniture & Joinery

Most furniture orders are a variant nobody has made before. A fixed bill of materials is the exception here, not the rule, and the board it is cut from decides whether the quote survives.

What a general system gets wrong here

Made to measure is the normal case

A kitchen is a set of dimensions, not a catalogue number. The bill of materials and the cutting list are generated from those dimensions, and the standard product is the rare one.

Panel optimisation decides the waste

Parts are nested on a board and what is left over is either usable stock or scrap. The quote assumed one of those, and the saw decided the other.

Finish multiplies the catalogue

One carcass in six veneers and four fabrics is one thing to make and dozens to sell. The showroom needs every combination priced without the factory holding every combination.

Delivery is assembly

The order is complete when it stands in the customer's room. A part missing on site is the most expensive shortage there is, because the crew, the lorry and the appointment are all spent.

See ERPNext running on your data

A 45-minute walkthrough tailored to your industry. No commitment.

Book a Demo